Address
Building 1, No. 22, Shexi Yongping Road,
Dongguan, Guangdong, China
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM
Address
Building 1, No. 22, Shexi Yongping Road,
Dongguan, Guangdong, China
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM
Fine art moves follow surveyed routes with heavy cases. This guide covers thickness from 2 mm to 12 mm, set-down planning and an art handling trial plan.
Cinema auditoria are dark, raked and fully fitted. This guide covers thickness from 2 mm to 12 mm, low-light safety and a cinema trial plan.
Footbridge works need light, secured protection on public routes at height. This guide covers thickness from 2 mm to 12 mm, wind restraint and a walkway trial plan.
Tunnel works need fire-approved, easily removable protection. This guide covers thickness from 2 mm to 12 mm, confined logistics and a tunnel trial plan.
Marina work combines salt, water and uneven decks. This guide covers thickness from 2 mm to 12 mm, corrosion and a dockside trial plan.
Bakeries combine flour dust, heat and heavy equipment. This guide covers thickness from 2 mm to 12 mm, dust control and a bakery trial plan.
GMP areas need approved, documented floor protection. This guide covers thickness from 2 mm to 12 mm, coved junctions and a pharmaceutical trial plan.
Hangar floors take jack loads and see fuel and oil. This guide covers thickness from 2 mm to 12 mm, fluid resistance and a hangar trial plan.
Server migrations move racks along routes built for people. This guide covers thickness from 2 mm to 12 mm, turning points and a migration trial plan.
Solar installs use a roof route and an internal route. This guide covers thickness from 2 mm to 12 mm, restraint, drainage and a solar trial plan.