Address
Building 1, No. 22, Shexi Yongping Road,
Dongguan, Guangdong, China
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM
Address
Building 1, No. 22, Shexi Yongping Road,
Dongguan, Guangdong, China
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM
External paving fails under loads on a flexible bed. This guide covers thickness from 2 mm to 12 mm, drainage, weather and a paving trial plan.
Atrium works risk dropped objects onto expensive floors. This guide covers thickness from 2 mm to 12 mm, impact resistance and an atrium trial plan.
Escalator works expose a floor edge and route heavy components publicly. This guide covers thickness from 2 mm to 12 mm, edge safety and a trial plan.
Lift modernisation forces all traffic onto stairs. This guide covers thickness from 2 mm to 12 mm, nosings, lobbies and a lift works trial plan.
Window replacement damages floors on the carry route. This guide covers thickness from 2 mm to 12 mm, sills, debris control and a trial plan.
Kitchen installs move heavy appliances on small contact points. This guide covers thickness from 2 mm to 12 mm, transitions, worktops and a trial plan.
Bathroom works damage routes more than bathrooms. This guide covers thickness from 2 mm to 12 mm, water control, thresholds and a bathroom trial plan.
Greenhouses and farm buildings are wet, corrosive and uneven. This guide covers thickness from 2 mm to 12 mm, drainage and an agricultural trial plan.
Breweries need protection that is wet-safe, load-bearing and hygienic. This guide covers thickness from 2 mm to 12 mm, drainage and a beverage trial plan.
Laboratories need approved, cleanable floor protection. This guide covers thickness from 2 mm to 12 mm, chemical compatibility and a laboratory trial plan.