{"id":6981,"date":"2026-10-28T06:54:44","date_gmt":"2026-10-28T06:54:44","guid":{"rendered":"https:\/\/www.mingplastics.com\/pp-honeycomb-protection-board-lift-modernisation-works.html"},"modified":"2026-10-28T06:54:44","modified_gmt":"2026-10-28T06:54:44","slug":"pp-honeycomb-protection-board-lift-modernisation-works","status":"publish","type":"post","link":"https:\/\/www.mingplastics.com\/fr\/pp-honeycomb-protection-board-lift-modernisation-works.html","title":{"rendered":"PP Honeycomb Protection Board During Lift Modernisation: Protecting Lobbies and Landings"},"content":{"rendered":"<div style=\"text-align:center;margin-bottom:30px\"><a href=\"https:\/\/www.mingplastics.com\/fr\/produit\/reusable-pp-protection-board-with-felt-backing-for-floor-wall-and-stair-protecti\/\"><img decoding=\"async\" src=\"https:\/\/www.mingplastics.com\/wp-content\/uploads\/2026\/08\/PP-Honeycomb-Felt-Board-096.jpg\" alt=\"PP honeycomb protection board application\" style=\"max-width:100%;height:auto;border-radius:8px\"><\/a><\/div>\n<p>Lift modernisation puts a building&#8217;s only vertical access out of service, which concentrates all material movement onto stairs and makes lift lobbies the busiest places on site. This article looks at protecting floors and lobbies during lift works. The focus is stair routes, lobby protection and managing a building without its lift.<\/p>\n<h2>Losing the lift changes how the building is used<\/h2>\n<p>When a lift is out, everything moves by stairs: materials, tools, and often residents&#8217; belongings. Stair nosings and landings suddenly carry loads they were never meant to.<\/p>\n<p>A rigid <a href=\"https:\/\/www.mingplastics.com\/fr\/produit\/custom-reusable-pp-honeycomb-protection-board-with-felt-surface-for-floor-wall-a\/\">PP <a href=\"https:\/\/www.mingplastics.com\/fr\/produit\/custom-reusable-pp-honeycomb-protection-board-with-felt-surface-for-floor-wall-a\/\">honeycomb protection board<\/a><\/a> protects stair treads and nosings, and gives landings a surface where materials can be set down safely.<\/p>\n<p>Because the panels are light, they can be carried up the stair they are protecting, which matters when there is no lift.<\/p>\n<h2>Thickness choices from 2 mm to 12 mm<\/h2>\n<p>Lift modernisation works concentrate traffic on stairs, so the middle part of the 2 mm to 12 mm range is usually right for treads and landings.<\/p>\n<p>For foot traffic a mid thickness is enough. Where materials and components are carried and set down on landings, thicker boards protect against concentrated loads.<\/p>\n<div style=\"overflow-x:auto\">\n<table style=\"border-collapse:collapse;width:100%\">\n<thead>\n<tr>\n<th scope=\"col\" style=\"border:1px solid #ccd9dc;padding:10px;text-align:left\">Board group<\/th>\n<th scope=\"col\" style=\"border:1px solid #ccd9dc;padding:10px;text-align:left\">Typical thickness<\/th>\n<th scope=\"col\" style=\"border:1px solid #ccd9dc;padding:10px;text-align:left\">Where it earns its place<\/th>\n<th scope=\"col\" style=\"border:1px solid #ccd9dc;padding:10px;text-align:left\">Watch-outs<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Light-duty panel<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">2-3 mm<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Landings with foot traffic only<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Wears at nosings under carried loads<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">General stair panel<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">4-6 mm<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Stair treads and landings during lift works<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Cover nosings fully; secure panels<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Heavy-duty panel<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">8-10 mm<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Landing set-down zones and component staging<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Check landing capacity<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Maximum protection<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">12 mm<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Heavy lift component moves on stairs<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Confirm stair and landing capacity<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2>Lobbies, landings and component handling<\/h2>\n<p>Protect each lift lobby on every floor, because that is where components are staged and where damage becomes a landlord issue.<\/p>\n<p>Protect landing set-down zones specifically, since carried items are put down at every level.<\/p>\n<p>Keep the stair route clear and complete, and inspect nosings daily, because a worn nosing during lift works is both damage and a safety issue.<\/p>\n<h2>How honeycomb board compares with cardboard, film and ply<\/h2>\n<p>Cardboard on stairs compresses and slides, which is dangerous when the stair is the only access route.<\/p>\n<p>Films tear on nosings within hours of heavy use. Plywood protects but is heavy to carry up the very stair that needs protecting.<\/p>\n<p>A PP honeycomb board is light enough to carry up, rigid enough for nosings and re-usable across the whole programme.<\/p>\n<h2>A practical trial plan for lift works<\/h2>\n<p>Protect one stair flight and one landing, leaving comparable areas on the current method. Inspect daily at the start and end of each working day.<\/p>\n<p>Run a carried-load test up the protected stair, then lift panels and check nosings and landings.<\/p>\n<p>Record nosing wear and any lobby damage, because during lift works those are the two areas that generate complaints.<\/p>\n<h2>What to include in a protection board enquiry<\/h2>\n<p>State the stair and landing finishes, the floor count, what will be carried and the fire performance required for escape stairs. Ask for the recommended thickness for treads.<\/p>\n<p>Ask whether the stair is an escape route, and request guidance on keeping it usable, plus custom cuts for uniform treads.<\/p>\n<p>For a quotation or sample panel, contact <a href=\"mailto:service@mingplastics.com\">service@mingplastics.com<\/a> or WhatsApp <a href=\"https:\/\/wa.me\/8618938871524\">+86 189 3887 1524<\/a>. Include the surface type, floor area, trades on site and expected duration so the recommended thickness, facing and fire performance can be confirmed before you order.<\/p>\n<h3>Final takeaway<\/h3>\n<p>During lift works, protect stair nosings and every lift lobby, secure panels on the only access route, and inspect daily.<\/p>","protected":false},"excerpt":{"rendered":"<p>Lift modernisation forces all traffic onto stairs. This guide covers thickness from 2 mm to 12 mm, nosings, lobbies and a lift works trial plan.<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-6981","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"blocksy_meta":[],"_links":{"self":[{"href":"https:\/\/www.mingplastics.com\/fr\/wp-json\/wp\/v2\/posts\/6981","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mingplastics.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mingplastics.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mingplastics.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mingplastics.com\/fr\/wp-json\/wp\/v2\/comments?post=6981"}],"version-history":[{"count":0,"href":"https:\/\/www.mingplastics.com\/fr\/wp-json\/wp\/v2\/posts\/6981\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.mingplastics.com\/fr\/wp-json\/wp\/v2\/media?parent=6981"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mingplastics.com\/fr\/wp-json\/wp\/v2\/categories?post=6981"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mingplastics.com\/fr\/wp-json\/wp\/v2\/tags?post=6981"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}