{"id":6922,"date":"2026-10-28T06:30:10","date_gmt":"2026-10-28T06:30:10","guid":{"rendered":"https:\/\/www.mingplastics.com\/pp-honeycomb-protection-board-hotel-refurbishment-phased.html"},"modified":"2026-10-28T06:30:10","modified_gmt":"2026-10-28T06:30:10","slug":"pp-honeycomb-protection-board-hotel-refurbishment-phased","status":"publish","type":"post","link":"https:\/\/www.mingplastics.com\/fr\/pp-honeycomb-protection-board-hotel-refurbishment-phased.html","title":{"rendered":"PP Honeycomb Protection Board for Hotel Refurbishment: Protect Floors Across Phased Works"},"content":{"rendered":"<div style=\"text-align:center;margin-bottom:30px\"><a href=\"https:\/\/www.mingplastics.com\/fr\/produit\/pp-construction-protection-sheet-with-felt-backing-for-building-renovation-and-r\/\"><img decoding=\"async\" src=\"https:\/\/www.mingplastics.com\/wp-content\/uploads\/2026\/08\/PP-Honeycomb-Felt-Board-105.jpg\" alt=\"PP honeycomb protection board application\" style=\"max-width:100%;height:auto;border-radius:8px\"><\/a><\/div>\n<p>Hotel refurbishment is done in phases while the property keeps trading, which means protection has to satisfy guests as well as contractors. Routes cross finished lobbies, corridors and guestroom floors that are already in service, and any damage is visible to paying customers the same day. This article looks at protecting surfaces during phased hotel works. The focus is guest-facing routes, night working and re-usable protection across repeated floors.<\/p>\n<h2>Phased works mean the same protection is used many times<\/h2>\n<p>A hotel refurbishment typically moves floor by floor, so protection is laid, lifted and re-laid dozens of times. That repetition is exactly where a re-usable board pays back: a single-use roll has to be bought again for every floor.<\/p>\n<p>The boards have to look acceptable in guest areas. A rigid <a href=\"https:\/\/www.mingplastics.com\/fr\/produit\/custom-reusable-pp-honeycomb-protection-board-with-felt-surface-for-floor-wall-a\/\">PP <a href=\"https:\/\/www.mingplastics.com\/fr\/produit\/custom-reusable-pp-honeycomb-protection-board-with-felt-surface-for-floor-wall-a\/\">honeycomb protection board<\/a><\/a> lies flat and stays in place, which matters in a corridor where a curling film would be both a trip risk and an eyesore.<\/p>\n<p>Because the panels do not absorb water, they can be wiped clean between phases, which is essential when the route passes through a live lobby.<\/p>\n<h2>Thickness choices from 2 mm to 12 mm<\/h2>\n<p>Hotel routes carry luggage trolleys, housekeeping carts and material deliveries, so the middle to upper part of the 2 mm to 12 mm range is usually right in circulation areas.<\/p>\n<p>For guestroom floors with only foot traffic and light works, a mid thickness is enough. For lobby and corridor routes used by trolleys daily, thicker boards prevent the crushed seams and scuffed finishes that show immediately to guests.<\/p>\n<div style=\"overflow-x:auto\">\n<table style=\"border-collapse:collapse;width:100%\">\n<thead>\n<tr>\n<th scope=\"col\" style=\"border:1px solid #ccd9dc;padding:10px;text-align:left\">Board group<\/th>\n<th scope=\"col\" style=\"border:1px solid #ccd9dc;padding:10px;text-align:left\">Typical thickness<\/th>\n<th scope=\"col\" style=\"border:1px solid #ccd9dc;padding:10px;text-align:left\">Where it earns its place<\/th>\n<th scope=\"col\" style=\"border:1px solid #ccd9dc;padding:10px;text-align:left\">Watch-outs<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Light-duty panel<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">2-3 mm<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Guestroom floors during light works<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Not for trolley routes<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">General route panel<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">4-6 mm<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Corridor and lobby routes under daily trolley traffic<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Seams taped; edges finished for quiet running<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Heavy-duty panel<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">8-10 mm<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Material deliveries and furniture moves floor by floor<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Heavier to move between floors; use the service lift<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Maximum protection<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">12 mm<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">Long programmes and repeated heavy moves<\/td>\n<td style=\"border:1px solid #ccd9dc;padding:10px\">More than guestroom work requires<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2>Night working, noise and guest routes<\/h2>\n<p>Plan the route so guests never have to walk on an unprotected or partially protected surface. Where a route must cross a finished area, complete it before the area is handed back each morning.<\/p>\n<p>Lay and lift protection outside guest hours where noise matters, and keep cutting outside occupied areas so dust does not reach finished surfaces.<\/p>\n<p>Tape seams and finish edges so the route is quiet under trolley wheels and does not present a trip edge in a corridor that guests use.<\/p>\n<h2>How honeycomb board compares with film, paper and ply<\/h2>\n<p>Adhesive films look tidy at first but lift at the edges in a busy corridor and leave residue on stone and polished floors, which is a housekeeping problem in a live hotel.<\/p>\n<p>Paper and thin rolls are cheap per metre but are replaced repeatedly across a phased programme, and the replacement work happens in guest areas.<\/p>\n<p>Plywood protects but is heavy to move floor by floor and awkward to store in a working hotel. A PP honeycomb board stacks flat, carries easily in a lift and is re-used on every floor, which is why it suits phased refurbishment.<\/p>\n<h2>A practical trial plan for hotel works<\/h2>\n<p>Protect one floor&#8217;s route and keep a comparable floor on the current method. Inspect at the end of each phase, photographing the same corridor points so wear is comparable.<\/p>\n<p>Run a trolley test with a loaded housekeeping or luggage cart over the route for a set number of passes, then lift and check the floor.<\/p>\n<p>Record lay and lift time per floor and how many phases each panel survived, because those two numbers decide the business case for a re-usable board.<\/p>\n<h2>What to include in a protection board enquiry<\/h2>\n<p>State the floor finishes, the route lengths, what uses the route and the phase programme. Ask for the recommended thickness, facing, panel size and fire performance required in a guest-occupied building.<\/p>\n<p>Ask for guidance on edge finishing and on cleaning between phases, and about custom sizes and colours where routes need to be marked or matched to the interior.<\/p>\n<p>For a quotation or sample panel, contact <a href=\"mailto:service@mingplastics.com\">service@mingplastics.com<\/a> or WhatsApp <a href=\"https:\/\/wa.me\/8618938871524\">+86 189 3887 1524<\/a>. Include the surface type, floor area, trades on site and expected duration so the recommended thickness, facing and fire performance can be confirmed before you order.<\/p>\n<h3>Final takeaway<\/h3>\n<p>In a phased hotel programme, reuse multiplies the saving. Specify thickness for the trolley routes, keep guest routes complete each morning, and track how many phases each panel survives.<\/p>","protected":false},"excerpt":{"rendered":"<p>Phased hotel works reuse protection dozens of times across guest-facing routes. This guide covers thickness from 2 mm to 12 mm, night working, cleaning and a hotel trial plan.<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-6922","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"blocksy_meta":[],"_links":{"self":[{"href":"https:\/\/www.mingplastics.com\/fr\/wp-json\/wp\/v2\/posts\/6922","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mingplastics.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mingplastics.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mingplastics.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mingplastics.com\/fr\/wp-json\/wp\/v2\/comments?post=6922"}],"version-history":[{"count":0,"href":"https:\/\/www.mingplastics.com\/fr\/wp-json\/wp\/v2\/posts\/6922\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.mingplastics.com\/fr\/wp-json\/wp\/v2\/media?parent=6922"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mingplastics.com\/fr\/wp-json\/wp\/v2\/categories?post=6922"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mingplastics.com\/fr\/wp-json\/wp\/v2\/tags?post=6922"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}