Address
Building 1, No. 22, Shexi Yongping Road,
Dongguan, Guangdong, China
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM
Address
Building 1, No. 22, Shexi Yongping Road,
Dongguan, Guangdong, China
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM
Bar and cafe fit-outs are tight and highly finished. This guide covers thickness from 2 mm to 12 mm, counter protection and confined-space handling.
Restaurant refits run between services with grease and water. This guide covers thickness from 2 mm to 12 mm, daily cycles and a restaurant trial plan.
Guestroom renovation repeats one scope many times. This guide covers thickness from 2 mm to 12 mm, bathrooms, thresholds and a guestroom trial plan.
Archive floors carry shelving loads beside sensitive collections. This guide covers thickness from 2 mm to 12 mm, dust control and a collections trial plan.
Theatre floors are raked and fire-regulated. This guide covers thickness from 2 mm to 12 mm, fire documentation, seating routes and an auditorium trial plan.
Stadium concourses must be perfect on event day. This guide covers thickness from 2 mm to 12 mm, event preparation, storage and a concourse trial plan.
Station works run overnight beside passengers. This guide covers thickness from 2 mm to 12 mm, fire standards, nightly clearance and a station trial plan.
Water treatment facilities are permanently wet. This guide covers thickness from 2 mm to 12 mm, drainage, compatibility and a treatment works trial plan.
Power and utility works run to outage windows with heavy plant. This guide covers thickness from 2 mm to 12 mm, cable drum routes, safety rules and a trial plan.
Chemical plant routes need compatible, permit-approved protection. This guide covers thickness from 2 mm to 12 mm, safety systems and a process-area trial plan.